Second slide
The projects we implemented:

• Building and equipping two health centers, maternity department, for Marie Stopes Organization, Sana’a (the main ring center - Shamlan branch).

• Supply and installation of electrical and electronic devices for a residential caravan and library project (for the Horizon Company).

• Supplying, installing and operating electrical systems with a capacity of 150 including solar panels, batteries, regulators and transformers for many companies and institutions.

• Supplying, installing and operating control and entry systems for many customers in several governorates.

• Supplying and printing promotional materials (cloth bags - electrical cabinets - various advertising products) for Yaman organization in addition to other corporate and institutional clients.

• Supplying advertising documents, publications and publications, and translating them to the Water and Sanitation Project Office of the World Bank.

• Supplying electrical materials to the Yemen Oman Telecommunications Company (YOU).

• Supplying and installing security and safety systems for many clients.

• Executing the following works in the Republican Hospital - Taiz:

- Installation of the medical gas network.

- Installation of Moonfield devices, the intensive care unit, the operating room, and the suspended and wall units.

- Installing and equipping the entire operating room.

- Installation of solar energy systems (60 kilowatts).

- Installing and supplying electrical wiring and UPS devices.

- Installing generators and control drums (L B C).

- Establishment of central air conditioning with an economical filter system (from 10 horses to 60 horses).